When the line walkers returned to M&FM, the gang was split into two for the remainder of the morning and the afternoon, with Martin W and Tony joining the pad replacement team, and Keith B, Martin B, Pete, and Adrian departing for Chawton to continue work on the new Pway hut. By the close of play, 2 3/4 lengths of track had been re-padded ( 6 1/4 lengths to go), the rear wall of the hut had been completed, and two timbers erected on the final, Alton facing wall (two more timbers left to go to the door opening and then the roof can go on). A great effort by all!
![]() |
| Eddie, Keith, and Neil on the morning re-padding shift |
![]() |
| New gang members Tony (left) and Martin W (right) assist Keith H on the afternoon shift |
| Keith B battles with tree roots and pieces of flint while excavating the trench for the rear Pway hut wall |
| The result at the end of the day |


No comments:
Post a Comment