Sunday, 24 December 2017

Saturday 23rd December

A gang of 8 assembled at HQ for the day's activities. Ian, Eddie, Adam and Simon headed off on the line inspection to Alresford with Neil, Brian Hi and Adrian C Alton bound. This left Keith H to go down to Alresford to attend to some urgent fence repairs at the end of the Perins siding.

On the return to M&FM, Eddie, Brian Hi, Adam, Simon and Adrian C travelled down to Alton where they removed  several decades of undergrowth (mainly ivy) from an abandoned Exmouth Jcn concrete works tool shed, in readiness for its re-location further down the line where it will be brought back into use.

                                                                   Before

                                                      ...............and after