On Tuesday, a trip was made to Alresford to adjust the position of some sleepers for the Signal Engineering Departments' ongoing work re-routing signal cables, and the standard steel rail keys were also replaced with Panlocs. En route, a residual supply of bricks were picked up from the new Pway hut at Northside Lane, and deposited at the construction site of the Pway hut at the A31 embankment.
Other work included a trip to Alton to deliver the newly restored ex Itchen Abbas corrugated hut to its final location adjacent to the water tower, and a dead and fallen Ash tree which had been spotted on the edge of Baigents Copse was cut up and the fence repaired.