The Alton contingent met Neil at the Station, who had arrived via the South West Trains service, and the return to base late morning was followed by an afternoon's work at the A31 embankment. Neil applied the last coats of paint to the Pway hut window, and Adrian made and fixed a weather drip above, completing the job with sleeper joint cover strips and a coat of Creocote. Eddie and Keith B meanwhile, lit a bonfire and continued to burn cut material on the embankment to the Ropley side of Farm Road bridge, with Keith H adding to the pile with his enthusiastic use of the chainsaw. Before departing, the new metal security shield for the hut window was installed.
No comments:
Post a Comment