Saturday 23rd May

Today was the first of a couple of days on the Railway for the Pway gang over the Bank Holiday weekend, with a second gathering planned for Monday to commemorate 30 years of the opening of the Alton to M&FM section of the line.

A gang of seven assembled at M&FM for the day's activities, with Ian J and Keith H departing on the line inspection to Alresford, Pete and Adrian C heading to Alton, and Eddie, Martin W, and John remaining at M&FM to start the next phase of fishplate oiling towards Alton. The Alton inspection team were joined at the Station by Neil and Paul, who had come to the Railway via South West Trains from Newbury and London respectively. By the time the linewalkers returned to base, the oiling gang had managed to complete the platform roads, and were heading down both sides of the loop to the western Station limits. 

Following refreshments prepared by Martin R, who had arrived just as the Alton train came into the Station, Neil and Paul stayed to help with the oiling, while the others went to the Chawton Heights hut, which is reaching the final stages of construction. Ian and Keith cut timbers for, and fitted the bench seating inside the hut, followed by sorting through and stacking the massive pile of timber off-cuts strewn across the site. The site certainly looked a lot tidier when they had finished, with a pile of timber to be kept, a pile to be burned, and a fire prepared ready for ignition. 
A much tidier site!
Adrian and Martin meanwhile fitted the very smart hut nameplate manufactured by Neil, and then started to fix the remaining timber battens across the joints in the walls, with Martin applying preservative and then 'Creocoting ' (creosote substitute) the battens and wall timbers. By the time they decided to finish at around 3.15 pm, only three battens on the rear wall and the Alton facing end wall were left to complete the task.


The hut nameplate in place, and very good it looks too



When the hut gang returned to M&FM, the oiling team had completed all of the track in the Station limits, including the first up siding and the start of the second, a great day's work.


The oiling team nearing the end of their successful day's
work.